| |||||||||
| Tanggal pengambilan dokumen | Unit | Judul Pengadaan |
| 24-05-2013 s/d 28-05-2013 | PGT | PENGADAAN BALL CLEANING PUMP DESALINATION PLANT DAN COAGULANT PUMP WWTP [Detail] |
| 24-05-2013 s/d 28-05-2013 | PGT | PENGADAAN AIR BAFFLE & KELENGKAPANNYA TI PLUS CRI GT 1.3 2014 (OEM) [Detail] |
| 24-05-2013 s/d 29-05-2013 | MRC | Pembuatan Simulator Hydro Power Plant [Detail] |
| 21-05-2013 s/d 27-05-2013 | SMG | PENGADAAN PERALATAN LEPAS PANTAI [Detail] |
| 16-05-2013 s/d 20-05-2013 | KMJ | Pengadaan Motor Fan Cooling Tower Unit PLTP Darajat [Detail] |
| 15-05-2013 s/d 21-05-2013 | KP | Pekerjaan Retrofit Hidrolik Governor Oil Control dan Governor Control Sub Unit UBP Mrica [Detail] |
| 08-05-2013 s/d 15-05-2013 | KP | Pekerjaan Implementasi Software Penunjang Manajemen Aset : Reliability [Detail] |
| 01-05-2013 s/d 08-05-2013 | SMG | JASA PEMELIHARAAN DAN PENGGANTIAN LAMPU LED, LAMPU STACK, LAMPU PENERANGAN DAN LAMPU EMERGENCY [Detail] |
| 02-05-2013 s/d 13-05-2013 | MRC | Pengadaan CCTV PLTA PBS dan Sub Unit UBP Mrica [Detail] |
| 01-05-2013 s/d 07-05-2013 | MRC | Pembuatan Simulator Hydro Power Plant [Detail] |
| Halaman ke: |
| Pengumuman Hasil Lelang |
| Tanggal pengumuman | Unit | Judul Pengadaan |
| 21-05-2013 | SLA | JASA PENYAMBUNGAN BELT CONVEYOR BC 19 COAL HANDLING UNIT 5-7 [Detail] |
| 10-05-2013 | MRC | Pengadaan Analog Input Module PLTA Kedungombo Tahun 2013 [Detail] |
| 07-05-2013 | MRC | Jasa Perbaikan Air Cooler Generator Unit 2 Sub Unit PLTA Wadaslintang Tahun 2013 [Detail] |
| 07-05-2013 | KP | Pekerjaan Jasa Konsultan Sertifikasi CFE Satuan Audit Internal [Detail] |
| 04-05-2013 | SLA | PENGADAAN ELECTRONIC CARD LEVEL TRANSMITTER UNIT 7 [Detail] |
| 04-05-2013 | SLA | PENGADAAN ISOLATION VALVE MIXE BED AB UNIT 5-7 [Detail] |
| 04-05-2013 | SLA | PERGANTIAN MODULE DEHC UNIT 5 & SOLENOID VALVE SEAL WATER CWP # 7 [Detail] |
| 29-04-2013 | MRC | Pengadaan Material Rutin Prediktif PLTA PB Soedirman Unit 3 Tahun 2013 [Detail] |
| 15-04-2013 | MRC | Pengadaan Material Pemeliharaan Sistem Eksitasi Unit 1, 2, 3 PLTA PB Soedirman Tahun 2013 [Detail] |
| 15-04-2013 | MRC | Pengadaan Material Rutin Prediktif Mesin PLTA PB Soedirman Main Compressor A [Detail] |
| Halaman ke: |